|
Build Your Online Product Catalogs?
Product Name: |
Water Turbine Generator 2kw For Power Station
|
Supply Ability: |
|
Related proudcts |
water turbine genera, water turbine gener, |
Specifications |
CT10 |
Price Term: |
T/T, D/P, L/C |
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
Small Hydro Power Generator/ Water Turbine Generator 1, Power: 0.3kw to 50kw 2, Water Head: 1-50m 3, Flow Rate: 0.021-0.15 m³/s 3,Speed range: 500-1500 rpm 4, Design and produce according to the power, speed, frequency that you need. Specification of Hydro Generator 2.1.Good Quality Medium and Small Hydro Power Generator / water turbine generator Unit with range 0.5kw-50kw; 2.2. Offer all types of generators, turbines, hydropower equipment, complete set of hydropower and other power plants, etc. 2.3. Equipments would be produced according to your request. 2.4. Engineers for erection and commission at hydropower plant are available. 2.5. There should be some key parameters (such as head, flow discharge and capacity, if need turbine generator too, 2.6. Please supply the frequency and output voltage, if not, give us the rotation speed) in inquiry. Note: Royway can design and manufacture various types of hydro generator units with 0.42-7m in turbine runner diameter and 20KW-200MW in unit capacity. Technical Parameters of micro hydro generator 2.1 Parameters 3 kw .jpg 2.4 Installation Drawing QQ20140110165950 .jpg QQ20140110165842 .jpg installation of mini hydro generator.jpg 3. Packaging 3.1 Standard exporting package 3.2 According to your requirements
4. About us 1) Chongqing Royway Machinery Co.,Ltd. We are mainly responsible for handing the export affairs of our group co***ny. We are manufacturer, we have our own factories and export right.
pinghe 5. Delivery 5.1 By Express ( FedEx, UPS, DHL, TNT, EMS, etc... ) --- Advantage: Fast ( takes about 7 - 10 days in the delivery ), door to door --- Disadvantage: A little expensive 5.2 By Air Transportation --- Advantage: Fast ( takes about 8 - 12 days ), a little cheaper than Express. --- Disadvantage: You need to take the goods from the airport by yourself. 5.3 By Sea ( Ocean ) Transportation --- Advantage: Much cheaper than Express or Air tr |
Company: |
Chongqing Royway Machinery Co.Ltd.
|
Contact: |
Mr. richard chen |
Address: |
Unit 10,24th floor,International Business Building B,No.27,Tenlong Rd,Nan'an district,Chongqing,China |
Postcode: |
400061 |
Tel: |
86 23 88323686 |
Fax: |
86 23 88323220 |
E-mail: |
|
|
|
|